Mining

Ten years of electrical power equipment with TGOOD Global

TGOOD Global has been operating since 2014 and we are reflecting on the past ten years of our involvement in the electrical engineering field. Since our beginning we have grown more than 30 times in size, having completed more than 400 projects. We have subsidiaries in 5 locations around the world and now deliver to […]

Ten years of electrical power equipment with TGOOD Global Read More »

TGOOD COVID-19 Crisis

TGOOD’s values shining through the COVID-19 crisis

View larger image In March the world slowed down and focused on fighting the COVID-19 pandemic. Most industries and enterprises were forced to stop, with 80% of energy projects being delayed for an indefinite period.  TGOOD Global’s manufacturing partners resumed their production capabilities to ensure that the TGOOD Global projects would be delivered as early

TGOOD’s values shining through the COVID-19 crisis Read More »

TGOOD TGS 11kV 630A/20KA CCVV RMU

TGOOD TGS 11kV 630A/20KA CCVV RMU enclosed in a TGOOD outdoor four-way kiosk

This gas insulated secondary switchgear (11kV 630A/20KA CCVV) ring main unit is enclosed in a TGOOD outdoor four-way electrical kiosk. It was delivered to the Australian mining sector this week and the lead time from the customer’s issue of a purchase order to delivery at site was just 10 weeks! If you would like further

TGOOD TGS 11kV 630A/20KA CCVV RMU enclosed in a TGOOD outdoor four-way kiosk Read More »

TGOOD Indonesian Martabe Gold Mine

Indonesian Martabe Gold Mine Boosts Economic Efficiency with TGOOD

Martabe Gold Mine, the world-class gold mine in Indonesia, has reported stunning achievements in cost savings afforded by TGOOD technology after just 6 months of operation. TGOOD provided a solution to their long-standing power supply problem. Due to excessive harmonic distortion and unbalanced voltage coming from the local network, the mine could not connect to

Indonesian Martabe Gold Mine Boosts Economic Efficiency with TGOOD Read More »