TGOOD Australia is celebrating the completion of our Chinchilla battery substation project. Together with CS Energy, our role in this project was to construct primary substations and medium voltage reticulation for the battery megapacks (battery energy storge system or BESS). ⚡
The Chinchilla Battery is a grid-scale battery that stores energy for release when it is needed. Located in Queensland’s Western Downs region, at the Kogan Creek Clean Energy Hub, the battery can discharge 100MW of electricity to power 33,000 homes for two hours.
In 2021 TGOOD Australia was chosen to carry out the design, manufacture and supply of MV switchgear and HV switchgear installed in a prefabricated e-house building, pictured above, for the Chinchilla BESS project. On-site commissioning occurred early in 2024 and the Chinchilla battery became operational in July 2024.
Thank you to all who contributed to make this project a success! ✨
For the Chinchilla BESS renewable energy project, TGOOD Australia provided:
⚡33kV switchroom with control room
⚡A 450A feeder
⚡ Medium voltage switchgear, including 7 panels
⚡Supervision with installation and commissioning of the equipment
_______________________________________________
TGOOD Australia offers substation solutions that are fully compliant and certified to IEC specifications and standards. Our kiosks and ehouses are prefabricated, saving time, while being flexible enough to meet the requirements of different energy projects.
Choosing a TGOOD compact substation reduces construction times by 3-6 months, and uses 20-30% less space than bricks-and-mortar substations.